Bathroom cabinet in the installation process must first determine the location of the installation, in the paving wall before the bathroom cabinet should first confirm the installation location. Since the bathroom cabinet needs to be pre-drilled with a drain hole, it is not possible to change the position after installation. Be sure to set the position before installing it.
The following are the same as the "
After determining the installation position of the bathroom cabinet, select the most suitable bathroom cabinet according to the size and shape of the reserved installation position. Or vice versa.
The following are the same as the "
After determining the wiring diagram of the water pipe and the wire, and then use the inflatable drill hole in the wall, so must be determined before the installation of the circuit diagram.
The following are the same as the "
To determine the height of the bathroom cabinet, the general standard bathroom cabinet height of 80cm or so, the specific installation height should be based on the use of family members to determine the habit.
The following are the same as the "
Install the different bathroom cabinet accessories model and punch size are not the same, but the installation process is basically the same.
Contact: MGAWE BATHROOM
Phone: +86-134-2912-0817
Tel: +86-133-8652-3190
Email: sales@mgawe-bathroom.com
Add: Dangshan Town, Xiaoshan District, Hangzhou, China 311245